What EPA is Doing to Reduce the Adverse Impacts of Surface Coal …

Fish and Wildlife Service, and. the West ia Department of Environmental Protection, issued an environmental impact statement looking at the impacts of surface coal mining and valley fills. This was done as part of a settlement agreement in the court case known as Bragg v. Robertson, Civ. No. 2:98-0636 (S.D. W.V.).


AP 42 11.9 Western Surface Coal Mining

The equations may be used to estimate particulate activity (e. g., distance traveled by a haul truck developed through field sampling of various western the surface coal mines located in the western United. In Tables 11.9-1 and 11.9-2, the assigned quality conditions that were tested in developing the should be derated 1 letter value (e. g.,


eCFR :: 30 CFR Part 77 -- Mandatory Safety …

This part 77 sets forth mandatory safety standards for bituminous, anthracite, and lignite surface coal mines, including open pit and auger mines, and to the surface work areas …


Mining Equipment & Spareparts | supratrading

Some of our mining and machinery parts include drive shafts, filters, axles, bushings, and hydraulic components. Our goal is to work closely with our Mining clients as their trusted process equipment partner. We can meet …


New Map Chronicles Three Decades of Surface …

Surface mining and a technique dubbed "mountaintop removal" have been controversial from the start for their use of explosives and heavy equipment to dig …


Coal Conveyors | Conveyor Belts for Coal Handling

The coal washing plant, which we also name as coal preparation plant, is to clean coal and remove out coal gangue. The coal conveyor is a very important equipment to process raw coal. The coal conveyors are mainly used to link coal washing machines and stockpile coal into stockyard, silo, bunker, etc. Coal Port Belt Conveyor.


Part 700. General

(2) The extraction of 250 tons of coal or less by a person conducting a surface coal mining and reclamation operation. A person. who intends to remove more than 250 tons is not exempted; (3) The extraction of coal as an incidental part of Federal, State or local government-nanced highway or other construction in. accordance with Part 707;


30 CFR Part 740 -- General Requirements for Surface …

PART 740—GENERAL REQUIREMENTS FOR SURFACE COAL MINING AND RECLAMATION OPERATIONS ON FEDERAL LANDS. Authority: 30 U.S.C. 1201 …


30 CFR Part 769

§ 769.11 Who may submit a petition. Any person having an interest which is or may be adversely affected by surface coal mining operations to be conducted on Federal lands may petition the Secretary to have an area designated as unsuitable for all or certain types of surface coal mining operations, or to have an existing designation terminated.


eCFR :: Title 30 of the CFR -- Mineral Resources

Part 400 [Reserved] Part 401: State Water Research Institute Program: 401.1 – 401.26: Part 402: ... Surface Coal Mining and Reclamation Operations Permits and Coal Exploration Systems Under Regulatory Programs: 772 – 785: Subchapter H: Small Operator Assistance: 795: Subchapter I [Reserved]


eCFR :: 43 CFR Part 3400 -- Coal Management: General

Subject to the provisions of § 3400.3-1, the Secretary may issue leases that authorize surface coal mining operations on Federal lands within the National Forest System, provided that such leases may not be issued on lands within a national forest unless the tract is assessed to be acceptable for all or certain stipulated methods of surface ...


Coal

Coal Mining Coal can be extracted from the earth either by surface mining or underground mining. Once coal has been extracted, it can be used directly (for heating and industrial processes) or to fuel power plants for electricity. Surface Mining If coal is less than 61 meters (200 feet) underground, it can be extracted through surface mining.


PART 762—CRITERIA FOR DESIGNATING AREAS AS UNSUITABLE FOR SURFACE COAL

Exploration operations on any lands designated unsuitable for surface coal mining operations must be approved by the regulatory authority under part 772 of this chapter, to ensure that exploration does not interfere with any value for which the area has been designated unsuitable for surface coal mining. [48 FR 41350, Sept. 14, 1983.


Coal explained Mining and transportation of coal

Mining coal. Coal miners use large machines to remove coal from the earth. Many U.S. coal deposits, called coal beds or seams, are near the earth's surface, but others are deep underground.Modern mining methods allow U.S. coal miners to easily reach most of the nation's coal reserves and to produce about three times more coal in …


eCFR :: 30 CFR Part 700 -- General

The regulations in chapter VII of 30 CFR, consisting of parts 700 through 899, establish the procedures through which the Secretary of the Interior will implement the Surface Mining Control and Reclamation Act of 1977 (Pub. L. 95-87, 91 Stat. 445 ( 30 U.S.C. 1201 et. seq. )). Chapter VII is divided into 13 subchapters.


Safety and Training | Mine Safety and Health Administration …

Part 48 covers all underground mining and surface mining of coal and some metals, like gold. Part 46 covers the aggregate industry, including granite, sand, gravel, lime and cement operations. There are key differences: Part 48 trainers must be approved by MSHA, and their instructor certification is kept on file by the agency; Part 46 trainers ...


PART 870—ABANDONED MINE RECLAMATION FUND—FEE COLLECTION AND COAL

Surface coal mining means the extraction of coal from the earth by removing the materials over the coal seam before recovering the coal and includes auger coal mining. For purposes of subchapter R, reclaiming coal operations are considered surface coal mining. ... The regulations in this part apply to all surface and underground coal mining ...


Clayton Furnaces | Replacement Parts | Stove Accessories

Clayton Furnace. 1537G 1600 and 1800 Furnace 1600G and 1800G 1600M Furnace 1602M Furnace 1602R, 1802G Furnace Clay 60 Phase II Fireplace Clay Fireplace 60 Clayton 6.0 Furnace 1200 Furnace Wood 45 Furnace Wood and Coal 1421800G Furnace Wood and Coal 5.6, 7.1 Model 1537Q. Furnaces by Clayton Navigate to a specific Furnace and …


OEM Underground Mining Parts, Equipment, …

Fax: (423) 869 - 5018. Committed to engineering, manufacturing and distributing of coal mining parts, Valley Mine Service Inc provides a superior alternative to traditional aftermarket channels by combining …


Coal | Properties, Formation, Occurrence and Uses

Coal density is controlled in part by the presence of pores that persist throughout charring. Pore sizes and pore distribution are difficult to measure; however, pores appear to have three size ranges: ... Most of a coal's effective surface area—about 200 square meters per gram—is found in the pores of the coal, not on the outer surface ...


30 CFR Part 800 -- Bond and Insurance Requirements for Surface Coal …

This part sets forth the minimum requirements for filing and maintaining bonds and insurance for surface coal mining and reclamation operations under regulatory programs in accordance with the Act. [ 48 FR 32959, July 19, 1983, as amended at 81 FR 93381, Dec. 20, 2016; 82 FR 54972, Nov. 17, 2017]


Detecting surface coal mining areas from remote …

The largest SCMA had an area of 16.57 km2, accounting for 9.18% of the total area of SCMAs. Forty-six SCMAs had an area between 1 and 10 km2. These SCMAs had a total area of 111.09 km2, accounting for 61.54% of the total area of SCMAs. In addition, nearly a half of the SCMAs (135) were smaller than 0.1 km2 [Fig. 5(b)].


Surface Mining Process | Steps In The Mining Process & Surface …

Most modern mining methods allow the coal miners to reach the nation's coal reserves and produce around three times more coal within an hour. Methods of Removing Coal. Coal is usually removed using three main methods; Surface mining – is ideal when the coal is less than 200 feet in the ground. In this case, the large machines will help ...


STATE OF ALABAMA SURFACE MINING COMMISSION

PART I C. (CONTINUED) 2. OWNERSHIP OF SURFACE AND MINERAL LANDS CONTIGUOUS TO THE AREA TO BE MINED. ... Give the legal description of the land upon which the applicant proposes to conduct surface coal mining operations. List each quarter-quarter section, section, township, range, and county. 3. Give the acreage of the …


The speed, scale, and environmental and economic impacts of surface

A case in point is the Mongolian Plateau, which is the largest surface coal mining region of the world (Fig. 1), but has not been studied as a whole on the scope and speed of coal mining and its environmental and socioeconomic impacts.The plateau covers an area of approximately 2.6 million square kilometers (i.e., 260 million ha), constituting …


30 CFR Part 71 -- Mandatory Health Standards—Surface Coal …

PART 71—MANDATORY HEALTH STANDARDS—SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Authority: 30 U.S.C. 811, 813(h), 957. Source: ... Dust collected with a sampling device approved by the Secretary and the Secretary of HHS in accordance with part 74 (Coal Mine Dust Sampling …


40 CFR Part 257 Subpart D -- Standards for the Disposal of Coal …

(b) This subpart applies to owners and operators of new and existing landfills and surface impoundments, including any lateral expansions of such units that dispose or otherwise engage in solid waste management of CCR generated from the combustion of coal at electric utilities and independent power producers.


Training | Mine Safety and Health Administration (MSHA)

Part 48 or Part 46? Learn what it means here. Training requirements are governed by sections of the federal code - 30 CFR Part 48 and Part 46. Part 48 covers all underground mining and surface mining of coal and some metals, like gold. Part 46 covers the aggregate industry, including granite, sand, gravel, lime and cement operations.


PART 2

PART 2. FINANCE. 82. The sub-groups consider that the financing of restoration is the top priority for action. 83. There are three aspects to finance within opencast mining namely, i) that financial assurance is in place at the outset to ensure that the restoration and aftercare requirements of planning permission can be implemented, …


PART 764—STATE PROCESSES FOR DESIGNATING AREAS UNSUITABLE FOR SURFACE

All relevant parts of the data base and inventory system and all public comments received during the public comment period shall be included in the record and considered by the regulatory authority in its decision on the petition. (b) (1) ... Prior to designating any land areas as unsuitable for surface coal mining operations, ...